诗词屋>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
    基于时间序列分解法建立大坝变形预测模型。
  • Thus it is very pressing for us integrating digital asset of TV media better, establishing the theory of digital asset management ( DAM), setting up operation modes and evaluation methods, etc..
    因而,对于如何更好的整合电视媒体的数字资产,构建基于数字资产管理(DAM,DigitalAssetManagement)的理论、运营模式及评价方法等,便成为当务之急。
  • Thirdly, the framework of early-warning system for ill reservoir dam is set up with the Web GIS technology. Based on the above, the classification and the selection and the principle of the early warning index is studied, including the developing method for the index system.
    构建了基于WebGIS的病险水库大坝预警系统架构,在此基础上,研究了预警指标的分类、预警指标筛选的条件和原则以及指标体系的构建方法。
  • Whatever happens, you have to dam up your feelings.
    无论发生什么,你必须控制住感情。
  • On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
    本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。
  • A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.
    因此一般采用上游坝面铺设复合土工膜和坝基垂直防渗措施进行防渗漏处理。
  • Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
    因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。
  • Stress variation law about masonry multi-arch dam is brought up a and the final stabilization layout to Pingqiao masonry multi-arch dam is decided.
    分析各加固方案对砌石连拱坝应力影响的基本规律,并确定适合本工程项目的加固方案;
  • The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
    堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。
  • This dam backs up the water to prevent floods.
    这个坝可以拦住水,以防泛滥。